How to finance? · Point of view · 4 min read
On 29 September, AanZET reopened with €119.2 million for zero-emission trucks. One day later, €98.7 million had already been requested. That is good news, as long as the subsidy finances a plan instead of replacing one.
In short
- Demand for AanZET is structurally higher than supply. Every round since 2022 has been oversubscribed.
- The award is where the work starts: the order must be definitive within a month, the truck stays registered to you for four years, and it has to fit a system of charging, grid, energy and planning.
- Reverse the order: design the operating plan first, then build the funding stack around it.
83% in one day
The second AanZET round of 2026 opened on Tuesday 29 September: €119.2 million, with up to €115,200 per truck. By the next day, €98.7 million, or 83% of the budget, had already been requested. That fits the pattern: every AanZET round since 2022 has been oversubscribed, and every year a lottery was needed.
Including this round, around €420 million in AanZET budget has been made available since 2022. By May 2026, 3,844 trucks had an award and 1,538 were already on the road. In April 2026, about 58% of all zero-emission trucks in the Netherlands had been financed with AanZET.
So entrepreneurs want to move, and the government is backing them. Take the subsidy. But don’t let the subsidy decide your strategy.
The numbers
€119.2m
AanZET budget for the round of 29 September to 16 October 2026
Source: RVO (2026)83%
Share of that budget requested by 30 September
Source: RVO (2026)~€420m
Total AanZET budgets 2022–2026, including this round
Source: Decisio evaluation of AanZET (2026)3,844
Trucks with an AanZET award by May 2026, of which 1,538 are on the road
Source: Decisio evaluation of AanZET (2026)1 in 5
Awards from 2024 that were later handed back unused
Source: Decisio evaluation of AanZET (2026)The award is where the work starts
Winning the subsidy is not the finish line. The conditions are clear, and they matter:
- Order within a month. Within one month of the grant decision, you must be able to show that the purchase is definitive.
- Keep it four years. The truck has to stay registered to you for four consecutive years. If you sell it earlier, you may have to pay back part of the subsidy.
- Deliver within twelve months. You request the final settlement within 12 months, with the registration and the invoice. The 70% advance depends on it.
- Choose your instruments. Since 2026, AanZET and the MIA tax deduction can no longer be combined on the same truck.
The official evaluation shows what happens when plans don’t hold. Depending on the year, 2% to 20% of the awarded budget was never used. In 2024, one in five awarded subsidies was eventually handed back, because companies cancelled the purchase or went bankrupt.
“Don’t look for a plan once you’ve won a subsidy. Look for the subsidy that finances your plan.”
Haijo Kampinga
A truck is not a transition
Then comes the real question. Where do you charge the truck, on which grid connection, under which contract and at what price? Does it fit your planning and your TMS, especially if your routes are less predictable and cross borders? Anyone can add a diesel truck to the pool. An eTruck asks you to think differently.
A truck is one part of a system that also includes charging hardware, grid capacity and possibly storage, energy contracts, planning software, maintenance and uptime, residual value and financing, and the people who work with all of it. The AanZET evaluation itself names grid congestion as the bottleneck for further growth: investments are being postponed because companies cannot get a grid connection for their chargers.
Offers often arrive per component: a truck here, a charger there, a bundle from one brand. Operators end up with parallel systems for a mixed fleet, or with lock-in. Neither leads to operational excellence.
Reverse the order
So here is our position: don’t look for a plan once you’ve won a subsidy. Look for the subsidy that finances your plan.
Start from the operation: routes and duty cycles, depot and grid position, replacement cycle, energy strategy and customer commitments. Design the target system. Then build the funding stack around it, from purchase subsidies and tax deductions to the truck-toll difference, green financing and European co-funding, and apply in the right order. Timing rules differ per scheme. Some require you to apply before you order, others within a set period after.
Decisions led by the subsidy risk lost grants, trucks that sit idle and a frustrated organisation. Decisions led by the plan shorten the payback time and improve operational efficiency, customer and employee satisfaction, and societal impact at the same time.
Invest now, or follow later?
Even where TCO and local energy availability still look unfavourable today, there is a strategic choice. You can invest now to be ready and stay ahead of the competition, or wait and try to follow. TNO’s latest analysis for PBL suggests the economics are turning. On TCO and range alone, battery-electric is the preferred choice for almost every new truck from 2026. The brake is the grid, and securing grid capacity takes years. Mobility also has low priority in the ACM’s framework for allocating new grid capacity. Planning early is itself an advantage.
Questions for your next leadership meeting
- Would we buy this truck without the subsidy, and if not, why not?
- Will our depot connection, energy contract and planning be ready for it within 12 months?
- Have we modelled the full funding stack, including which schemes rule each other out?
Where EUlectrify fits
EUlectrify is brand-independent by design. We help operators define the target system first (vehicles, charging, energy and financing) and compare offers side by side before they commit. One plan, multiple brands, no lock-in.
Get started →Haijo Kampinga
Co-founder & Managing Director, EUlectrify · LinkedIn
Haijo previously worked on supply chain and logistics sourcing strategy at Philips and advised automotive, energy and supply chain clients at KPMG.
Sources
- RVO: Aanschafsubsidie Zero-Emissie Trucks (AanZET), status 30 September 2026
- Decisio for the Ministry of Infrastructure and Water Management: Evaluatie AanZET, eindrapportage (July 2026)
- TNO for PBL: Effecten van netcongestie en mitigerende maatregelen op de adoptie van elektrische vrachtwagens (TNO-2026-17724, August 2026)
Join the conversation on LinkedIn
- Haijo (NL): 83% in één dag (30 Sep 2026)